Information disclosure of the second environmental impact assessment of Baotou Kerui micro magnetic new materials Co., Ltd. phase I project of industrialization of 5000 tons of rapidly quenched magnetic powder

  • Categories:公司新闻
  • Author:
  • Origin:
  • Time of issue:2019-04-11 19:38
  • Views:

(Summary description)经济适用:我们在满足客户需求,保证产品质量的同时,努力追求更低的成本。

Information disclosure of the second environmental impact assessment of Baotou Kerui micro magnetic new materials Co., Ltd. phase I project of industrialization of 5000 tons of rapidly quenched magnetic powder

(Summary description)经济适用:我们在满足客户需求,保证产品质量的同时,努力追求更低的成本。

  • Categories:公司新闻
  • Author:
  • Origin:
  • Time of issue:2019-04-11 19:38
  • Views:
Information

1. Name and outline of the construction project

1.1 project name:

Baotou Kerui micro magnetic New Material Co., Ltd. annual output of 5000 tons of rapid quenching magnetic powder industrialization phase I Project

1.2 construction site

The construction site of the project is located in Fengguang new energy electromechanical Industrial Park of Binhe new area, with geographical coordinates of 109 ° 52 ′ 56.17437 ″ E and 40 ° 33 ′ 56.23644 ″ n.

1.3 main construction contents and scale

The project constructs the industrial chain of rapidly quenched magnetic powder - injection molding Nd-Fe-B granular material - injection molding magnet. After the completion of the project, the annual output of the project will be 2000t fast quenched magnetic powder, 500t injection molded Nd-Fe-B granular materials will be produced from the fast quenched magnetic powder, and 500t injection molded magnets will be produced from the injection molded Nd-Fe-B granular materials.

1.4 total project investment

The planned total investment of the project is 120 million yuan, including 100 million in fixed assets and 20 million in current assets. The project fund is 34 million yuan raised by the enterprise and 86 million yuan for key industrial projects.

2 key points of conclusions proposed in the environmental impact report

The site selection of the project is reasonable and in line with relevant national and local plans and relevant industrial policies. The project adopts cleaner production processes and technologies to control pollution from the source, and adopts advanced and reliable treatment and disposal measures for waste gas, waste water and solid waste. All pollutants can be discharged up to standard, and the treatment measures are feasible with little impact on the surrounding environment; Comprehensive utilization and proper disposal of solid waste; After taking measures, the noise has little impact on the environment; Meet the requirements of cleaner production and circular economy. Therefore, the evaluation shows that the project is feasible from the perspective of environmental protection.

3 public information

3.1 network links to the full text of the draft for comments on the environmental impact report and ways and means to consult the paper report

Web link to the full text of the draft for comments: https://www.eiabbs.net/thread-305588-1-1.html

Ways and means of consulting paper reports:

Access method: obtain access from the environmental assessment unit and the construction unit by telephone, fax, e-mail, etc.

Time limit for request for review: 10 working days from the date of promulgation of this announcement;

EIA unit: Inner Mongolia Huatai Hanguang Environmental Technology Co., Ltd;

Mailing address: 701, block C, Times Square, No. 86, Huanghe street, rare earth high tech Zone, Baotou, Inner Mongolia Autonomous Region

Contact: Dong Yuying Tel: 15804081169

Email: 906120139@qq.com

Name of employer: Baotou Kerui micro magnetic New Material Co., Ltd

Tel.: 15174947957

Contact: Wang Zhigang

3.2 public scope for comments

The scope of soliciting public opinions is around the project and areas that may be affected.

3.3 network link of public opinion form

Web link to the public opinion form:

https://pan.baidu.com/s/1pk8FvOylwtaLljLSwKYiGg

3.4 ways and means of public comments

Ways for the public to put forward opinions: the public shall fill in the public opinion form for environmental impact assessment of construction projects and feed back to the construction party or environmental assessment institution by mail, wechat, mail and other means.

3.5 starting and ending time of public comments

10 working days from the date of issuance of this announcement

Baotou Kerui micro magnetic New Material Co., Ltd

2020-6-30

Scan the QR code to read on your phone

这是描述信息

About us    Recruitment     Environment

 

News    Marketing network    Download

 

Product Application   Product Center  Contact Us

Contact us:

Telephone: 0472-5217177

Fax: 0472-5217478

Website: www.cnkrwc.com

Address: high-tech industrial base, rare earth high-tech industrial development zone, baotou city, Inner Mongolia

这是描述信息

Mobile QR code